Jugnu by Hussain Rehar Unstitched Embroidered Cotton 3 Piece Suit HR26UJC DIRYAZ - Festive Collection
- Free UK shipping. International Shipping calculated at checkout.
- In stock, ready to ship
- Inventory on the way
Description:
A classic red long shirt adorned with multicolor floral embroidery is paired with beautifully detailed bell sleeves, featuring monochrome embroidered organza patches for an added touch of refinement. The look is completed with a red, dyed pleated trouser that adds structure and flow, while a digital printed silk dupatta brings in a soft contrast and elevates the ensemble with a contemporary finish.
Fabric Details in Meters (Unstitched):
- Digital Printed Dupatta (Silk) 2.5 Meters
- Embroidered Front Center Panel (Cotton) 1 Piece
- Embroidered Front Right Panel (Cotton) 1 Piece
- Embroidered Front Left Panel (Cotton) 1 Piece
- Dyed Back (Cotton) 0.78 Meters
- Embroidered Sleeves Right & Left Panel (Cotton) 4 Pieces
- Embroidered Sleeves Borders (Cotton) 1.3 Meters
- Embroidered Front Back Daman & Side Extensions Border 01 (Cotton) 6.1 Meters
- Embroidered Front Back Daman & Side Extensions Border 02 (Cotton) 6.1 Meters
- Embroidered Allover Border (Cotton) 10.3 Meters
- Embroidered Shirt Motifs Patches (Organza) 10 Pieces
- Dyed Trouser (Cotton) 2 Meters
- Dry Cleaning Recommended.
- Please press garments with moderate heat settings.
- Avoid direct sunlight on garments.
- Do not use any type of bleach or stain removing chemicals.
- Actual color may slightly vary from image shown.
We are not responsible for any damages resulting from washing in any other methods than what is recommended.
Standard delivery time is 2-5 working days after the product is dispatched. (Within UK)
Stitched pieces can take up to 3 weeks to be delivered. (Within UK)
European orders are shipped via standard delivery service and we will make sure to deliver your order within 7-10 working days. (International)
Same standard delivery service is carried out for International Orders (Including USA, Canada) within 10-15 working days. (International)
Ready-to-wear products will take up to 14 working days to be delivered.
