Afsanay by Zariya Luxury Embroidered Unstitched Chiffon 3 Piece Suits ZRY25LF D1 ZB50033 - Festive Collection
Afsanay by Zariya Luxury Embroidered Unstitched Chiffon 3 Piece Suits ZRY25LF D1 ZB50033 - Festive Collection
Afsanay by Zariya Luxury Embroidered Unstitched Chiffon 3 Piece Suits ZRY25LF D1 ZB50033 - Festive Collection
Afsanay by Zariya Luxury Embroidered Unstitched Chiffon 3 Piece Suits ZRY25LF D1 ZB50033 - Festive Collection

Afsanay by Zariya Luxury Embroidered Unstitched Chiffon 3 Piece Suits ZRY25LF D1 ZB50033 - Festive Collection

Regular price£124.99
/

  • Free UK shipping. International Shipping calculated at checkout.
  • Low stock - 1 item left
  • Inventory on the way
Size Chart

Shirt:

  • Embroidered Front, Left Panel Handmade (Bareeze Net): 1 Pc
  • Embroidered Front, Right Panel Handmade (Bareeze Net): 1 Pc
  • Embroidered Sleeves (Bareeze Net): 1 Pair
  • Flock Print Back (Bareeze Net): 1 Yard
  • Embroidered Sleeves Patti Handmade (Bareeze Net): 1 Pc
  • Embroidered Front, Slit Patti (Bareeze Net): 2.75 Yards
  • Embroidered Front Daman Handmade Patti (Bareeze Net): 0.90 Yard
  • Embroidered Back Daman Patti (Bareeze Net): 0.90 Yard
  • Dyed Inner Shirt, Inner Trouser (Korean Silk): 7 Yards
  • Fabric: Bareeze Net

Dupatta:

  • Embroidered Dupatta (Bareeze Net): 2.75 Yards
  • Embroidered Dupatta Pallu Patti (Bareeze Net): 2.75 Yards
  • Fabric: Bareeze Net

Lehanga:

  • Dyed Lehenga (Chiffon): 5 Yards
  • Fabric: Chiffon

Details:

  • Color: Ivory
  • Design: Embroidered

- Dry Cleaning Recommended.
- Please press garments with moderate heat settings.
- Avoid direct sunlight on garments.
- Do not use any type of bleach or stain removing chemicals.
- Actual color may slightly vary from image shown.

We are not responsible for any damages resulting from washing in any other methods than what is recommended.

Standard delivery time is 2-5 working days after the product is dispatched. (Within UK)

Stitched pieces can take up to 3 weeks to be delivered. (Within UK)

European orders are shipped via standard delivery service and we will make sure to deliver your order within 7-10 working days. (International)

Same standard delivery service is carried out for International Orders (Including USA, Canada) within 10-15 working days.  (International)

Ready-to-wear products will take up to 14 working days to be delivered.

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.


Recently viewed